Los Angeles Drywall & Framing logo
About
Process
Gallery
Services
Not sure what you need?Describe it and we'll point you right
Drywall InstallationBoard hung fast and hung straightDrywall RepairHoles, cracks and water damage undoneDrywall FinishingTaped and sanded up to Level 5Drywall TexturingKnockdown, orange peel and skip trowelDrywall PatchingSmall holes gone without a traceFire Rated Drywall InstallationType X and Type C to the listingSoundproof Drywall InstallationAssemblies built to a target STCMold Resistant Drywall InstallationBoard that survives wet roomsImpact Resistant Drywall InstallationCorridors that shrug off cartsDrywall DemolitionClean removal with the dust contained
All drywall services

Licensed, Bonded & Insured — CA Lic. #1141917

View all 45 services
Service Areas
Don't see your area?We probably cover it. Ask us.
Beverly HillsEstate finishes and hillside permitsWest HollywoodDense rentals and design district TIHollywoodStages, studios and historic coresDowntown LAHigh rise shafts and office TISanta MonicaCoastal permits and soft story retrofitsPacific PalisadesFire rebuilds under the 2026 codeMalibuCoastal Commission and salt airBrentwoodCanyon lots and Level 5 finishesCulver CityCreative office and studio buildouts
All Los Angeles areas

Licensed, Bonded & Insured — CA Lic. #1141917

View all 25 areas
FAQ
Contact
(310) 730-9832Get Free Estimate
Steel stud partitions framed on an office tenant improvement floor in Los Angeles
Interior Partitions

Steel Stud Partition Installation in Los Angeles, CA

A steel stud partition is an interior non load bearing wall framed from light gauge steel studs and track, laid out to a partition type on the drawings and built to carry only its own weight, its finishes and whatever gets hung on it. Los Angeles Drywall & Framing installs metal stud partitions for office tenant improvements, retail buildouts, medical suites, hotels and schools across LA County. Most of the value in this trade is invisible after the board goes on: the layout accuracy, the backing behind every fixture, and the partition type actually matching what the wall legend says it should be.

Get a Partition Takeoff
Metal stud partition with steel backing installed for wall hung casework

Metal Stud Partitions

Los Angeles, CA

The Work

Partition Types Are a Contract, Not a Suggestion

Almost every commercial set carries a partition schedule that assigns a letter or number to each wall type and defines the stud width, the stud thickness, the spacing, the number and type of board layers, the insulation, the rating and how high the wall runs. On a typical office floor there may be eight or ten types in play, and they look identical once taped. Building a full height rated wall where the schedule called for a partial height type, or running 25 gauge studs where the schedule called for 20, is the kind of error that surfaces at inspection or at a sound complaint months later. We take off the plan by type, color the walls, and frame from that marked set.

The California Building Code sets a floor for how strong any interior partition has to be. Interior walls and partitions over six feet tall, including their finish materials, must resist a horizontal load of not less than 5 pounds per square foot. That single number is why stud spacing, stud thickness and wall height cannot be chosen by feel. In Los Angeles it is compounded by seismic requirements on anything hung from or braced to the partition, and LADBS reviews partition bracing on tenant improvement permits routinely. Partial height walls, glass storefront pockets and freestanding demountable systems all need a documented lateral path, which usually means diagonal kickers back to the structure at a spacing shown on the drawings.

Fire rated partitions carry a further constraint: the wall has to match a tested assembly. Non load bearing steel stud designs such as UL U419 and UL U465 were tested with a minimum steel thickness, a stated stud spacing, specific board thickness and layer count, and defined fastener spacing. UL has published guidance clarifying how stud metal thickness in those wall designs is to be applied, and the field consequence is simple: heavier steel is not automatically acceptable and lighter steel is never acceptable. We build rated partitions from the listing sheet named in the specification and keep it on site so the wall can be verified rather than argued about.

Scope Detail

What a Complete Partition Package Includes

Layout From Control Lines

Partitions are laid out from the building control lines and column grid, not from an existing wall that may itself be out of square. We snap both faces of every wall so door openings, corridor widths and clear dimensions are verified before track is anchored. On tenant improvement floors we shoot the slab for high spots first, since a 3/4 inch hump under a corridor wall becomes a visible taper in the finished base. Openings are laid out to the door schedule with frame throat and hardware clearance accounted for.

Backing and Blocking

Everything that gets attached to a partition later needs steel behind it. We install flat strap, boxed studs or steel blocking for upper cabinets, countertops, wall hung casework, monitors and displays, handrails, grab bars, fire extinguisher cabinets, whiteboards, headwall equipment and door stops. Backing locations come from the architectural elevations, the equipment schedule and a walk with the tenant, and we mark them on the slab so a later trade can find them. Missing backing is the most expensive partition defect because it is only ever found after the wall has been taped, painted and turned over.

Coordination With MEP

Partitions are punched steel, and the punchouts are where conduit, water lines, waste and low voltage run. We set studs with the knockouts aligned so the plumbing and electrical crews are not cutting the web on their own. Where a large penetration is unavoidable we install the reinforcement the drawings require rather than leaving a notched stud. In rated walls we hold penetrations to the locations the assembly and the firestop listings permit, since an unlisted opening in a rated partition is a correction notice that stops the ceiling from closing.

Completed interior metal stud partition layout ready for drywall
Metal stud partition with steel backing installed for wall hung casework

Nonstructural Member Standards

Interior partition studs are nonstructural members made to ASTM C645 and installed per ASTM C1007. Common interior thicknesses run from 18 mil through 33 mil, and a 20 gauge nonstructural stud is typically 30 mil rather than the 33 mil that a 20 gauge structural stud requires. We confirm which of those two the specification means before ordering, because the words on a drawing rarely distinguish them and the difference is invisible once the studs are stood and boarded on both faces.

Deflection and Finish

Partition framing is designed to a deflection limit tied to the finish it carries. Gypsum board and veneer plaster are generally held to L/240, conventional plaster to L/360, and L/120 is treated as an outer bound for flexible finishes only. The limit, the wall height and the stud spacing together drive the stud selection, which is why a tall lobby partition needs a heavier section than the same wall type in an office.

Steel stud partitions framed on an office tenant improvement floor in Los Angeles
Specifications

Partition Framing Reference

Numbers we confirm against the partition schedule and the wall legend before any track is shot to the slab on a Los Angeles tenant improvement.

Minimum Lateral Load
Interior walls and partitions exceeding six feet in height, including their finish materials, must have the strength and stiffness to resist a horizontal load of not less than 5 pounds per square foot.
Stud Spacing
Interior partitions are typically framed at 16 or 24 inches on center. Spacing is set by the partition schedule and by any tested assembly the wall has to match, not by the installer.
Nonstructural Members
Partition studs and track are nonstructural framing members under ASTM C645. Erection follows ASTM C1007, which requires full and uniform bearing at the bottom track and studs seated square rather than forced.
Screw Selection
For steel under 0.033 inch, ASTM C1002 Type S self piercing screws are used to attach board. Where a partition uses heavier framing, ASTM C954 self drilling screws are required instead.
Rated Wall Designs
Non load bearing rated partitions follow tested designs such as UL U419 and UL U465, which fix the minimum stud thickness, board layers and fastener spacing. The listing sheet governs every one of those variables.
Deflection Criteria
L/240 for gypsum board and veneer plaster finishes, L/360 for conventional plaster. L/120 is an outer limit and is not appropriate for a wall that will be taped and painted.
Backing Members
Flat strap, boxed stud sections or formed steel blocking placed at the elevation shown on the drawings. Backing is installed before board and its location is marked so following trades can locate it.
Our Process

How We Frame a Partition Package

Tenant improvement schedules are tight and the framing crew is usually the first trade with real production on the floor. This sequence keeps the rest of the job on time.

1

Marked Set and Wall Type Takeoff

We take the partition schedule off the drawings and mark up a working set where every wall on the plan is colored to its type. Full height, deck height, partial height and rated walls each get their own color. That marked set goes to the field lead and to the crew, which is how a floor with ten similar looking wall types gets framed correctly without anyone rereading the legend at every corner.

2

Slab Layout and Door Verification

Wall lines are pulled from the control grid and both faces are snapped. We verify every door opening against the door schedule, including rough opening width, frame depth and required clear dimensions at accessible routes, before track is fastened. Corridor widths and any dimension carrying an accessibility requirement are checked on the slab, because correcting one after framing means moving a wall rather than moving a mark.

3

Track, Studs and Openings

Bottom track is anchored to the slab and top track is set to the deck or to the ceiling line depending on wall type. Studs are cut, seated with full bearing and set at the scheduled spacing with punchouts aligned. Door openings receive jamb studs, a header and cripples per the detail, and hollow metal frames are set and anchored as the wall is framed rather than forced in afterward.

4

Backing, Bracing and Rated Detailing

Backing goes in for every wall hung item on the elevations and the equipment schedule. Partial height walls and glass pocket conditions receive diagonal bracing back to the structure at the spacing on the drawings. Rated partitions are framed to the listing, with stud thickness, spacing and any required firestopping locations confirmed before the first sheet of board is stood against the wall.

5

Framing Walkthrough and Handoff

The field lead walks the floor against the marked set, checking wall types, plumb, spacing, opening dimensions, backing locations and bracing. We then walk it a second time with the general contractor and, where applicable, the tenant representative, so any late change lands while the wall is still open. Backing locations are photographed and marked before the board crew starts.

Work That Goes With This

Services That Pair With Steel Stud Partition Installation

Partitions rarely arrive alone. These are the scopes that get built alongside them.

Metal Framing services by Los Angeles Drywall & Framing

Metal Framing

Steel stud framing for commercial and residential projects requiring non-combustible or high-strength structural solutions. Code-compliant metal framing systems.

View Service
Commercial Metal Stud Framing services by Los Angeles Drywall & Framing

Commercial Metal Stud Framing

Full-building metal stud framing for commercial shells and tenant improvements: partitions, shaft walls, rated corridors, and exterior backup framing on schedule.

View Service
Deflection Track Installation services by Los Angeles Drywall & Framing

Deflection Track Installation

Slotted deflection track, slip track, and double-track head-of-wall systems that absorb live load deflection and seismic drift without transferring load into the partition.

View Service
Chase Wall & Bulkhead Framing services by Los Angeles Drywall & Framing

Chase Wall & Bulkhead Framing

Plumbing chase walls, mechanical chases, soffits, and bulkheads framed to conceal risers, ductwork, and structure without sacrificing usable floor area.

View Service
Service Area

Where We Provide Steel Stud Partition Installation

We frame interior steel stud partitions for commercial tenants across Los Angeles County.

Central Los Angeles

  • Beverly Hills
  • West Hollywood
  • Hollywood
  • Downtown LA

Westside & Beach Cities

  • Santa Monica
  • Pacific Palisades
  • Malibu
  • Brentwood
  • Culver City

San Fernando Valley

  • Burbank
  • Glendale
  • Sherman Oaks
  • Studio City
  • North Hollywood
  • Encino
  • Van Nuys

Foothill Communities

  • Pasadena
  • Altadena

South Bay & Long Beach

  • Manhattan Beach
  • Torrance
  • Long Beach

Orange County

  • Irvine
  • Newport Beach
  • Costa Mesa
  • Huntington Beach
Common Questions

Steel Stud Partition Questions

What is a metal stud partition and how is it different from a structural wall?
A metal stud partition is an interior wall that divides space without carrying any of the building load. It supports its own weight, the drywall, the insulation and whatever is hung on it, and it has to resist a modest horizontal load, but no beam or floor above bears on it. Structural steel stud walls use heavier sections, web stiffeners and rigid connections because they are part of the load path. The practical difference on site is the steel thickness, the connection at the top of the wall and whether the framing came from a stamped engineering package.
How long does it take to frame partitions on an office tenant improvement?
For a straightforward open plan floor with a normal number of offices and conference rooms, framing typically moves faster than any other trade on the schedule, and the pace is usually set by layout verification and by how quickly hollow metal frames arrive rather than by the framing itself. Complications that slow it down are rated corridor walls, heavy backing schedules, curved or angled walls, existing conditions that turn out of square, and floors where demolition uncovered something unexpected. We give a linear foot per day rate against your specific plan rather than a generic duration.
Do I need backing for a wall mounted television or cabinets?
Yes, and it has to go in before the drywall. Steel studs are thin, and a toggle or a hollow wall anchor into 25 gauge steel will not hold a display bracket, an upper cabinet run or a heavy monitor arm under real use. We install flat strap, boxed studs or steel blocking across the studs at the mounting height shown on the elevations. If the mounting height is not yet decided, we install a continuous band of backing over the likely range, which is far cheaper than opening a finished wall later. Bring us the equipment schedule early.
How do you frame a partition that has to stop at the ceiling instead of the deck?
A wall that terminates at the ceiling line has no top support from the structure, so the lateral load has to go somewhere. The drawings normally show diagonal kicker braces from the top of the wall back to the deck at a specified spacing, typically at a defined angle and fastened at both ends with the connection the detail calls for. Partial height walls, which stop below the ceiling entirely, also need bracing or a heavier stud sized as a cantilever. Los Angeles is a high seismic region and these braces are inspected, so they are not optional even when they sit above a ceiling nobody will open.
Can you build fire rated and sound rated partitions?
Yes. Fire rated partitions are framed to a tested non load bearing design, and common examples include UL U419 and UL U465, each of which sets a minimum stud thickness, a stud spacing, a board layer count and a fastener pattern. Sound rated partitions are a separate specification driven by an STC target and may add insulation, an additional board layer, a staggered or double stud configuration, or a decoupling channel. The two requirements often land on the same wall, and when they conflict we get the architect to confirm which listed assembly satisfies both before we frame it.
Do partition walls need a permit for an office remodel in Los Angeles?
Adding, removing or relocating interior partitions generally requires a building permit from LADBS, and the review will look at egress, occupancy load, accessibility, fire rated separations and the bracing of nonstructural elements. Tenant improvement permits also frequently trigger accessibility upgrades to the path of travel and to restrooms. We are not your permit expediter, but we build to the approved set and we will tell you when a field change is significant enough that it needs to go back through plan check rather than be absorbed quietly.
Get In Touch

Request a Free
Estimate

We are ready to bring your project to life. Reach out for a free estimate on your drywall, framing, or specialty project. Our team responds within 24 hours.

Office LocationLos Angeles, CA
Business HoursMon-Fri: 8AM to 6PM, Sun: Open
Call Us(310) 730-9832
Email Ussales@losangelesdrywallandframing.com

Request Your Free Estimate

Los Angeles Drywall & Framing logo

Licensed drywall contractor and framing specialist serving Los Angeles, CA and the surrounding metro area. Quality craftsmanship for residential and commercial projects. CA License #1141917.

(310) 730-9832sales@losangelesdrywallandframing.com
Los Angeles, CA

Services

Drywall Services
  • Drywall Installation
  • Drywall Repair
  • Drywall Finishing
  • Drywall Texturing
  • Drywall Patching
  • Fire Rated Drywall Installation
  • Soundproof Drywall Installation
  • Mold Resistant Drywall Installation
  • Impact Resistant Drywall Installation
  • Drywall Demolition
Framing & Metal Stud
  • Wall Framing
  • Residential Framing
  • Commercial Framing
  • Rough Carpentry
  • Custom Framing
  • Rough Opening & Header Framing
  • Chase Wall & Bulkhead Framing
  • Fire Rebuild Construction
  • Metal Framing
  • Cold Formed Steel Framing
  • Deflection Track Installation
  • Steel Stud Partition Installation
  • Tall Wall Metal Framing
  • Metal Framed Ceiling Installation
  • Hat Channel Installation
  • Resilient Channel Installation
Stucco, Paint & Sheathing
  • DensGlass Sheathing Installation
  • Exterior Gypsum Sheathing
  • Stucco
  • Stucco Patching
  • Stucco Lath Installation
  • Stucco Waterproofing
  • Stucco Removal & Remediation
  • Exterior Painting
  • House Painting
  • Interior Painting
Commercial & Multi-Family
  • Commercial Metal Stud Framing
  • Commercial Wood Framing
  • Commercial Stucco
  • Commercial Painting
  • Multi-Family Drywall
  • Multi-Family Metal Stud Framing
  • Multi-Family Wood Framing
  • Multi-Family Stucco
  • Multi-Family Painting

Service Areas

Central LA & Westside
  • Beverly Hills
  • West Hollywood
  • Hollywood
  • Downtown LA
  • Santa Monica
  • Pacific Palisades
  • Malibu
  • Brentwood
  • Culver City
San Fernando Valley
  • Burbank
  • Glendale
  • Sherman Oaks
  • Studio City
  • North Hollywood
  • Encino
  • Van Nuys
South Bay & Foothills
  • Pasadena
  • Altadena
  • Manhattan Beach
  • Torrance
  • Long Beach
Orange County
  • Irvine
  • Newport Beach
  • Costa Mesa
  • Huntington Beach

Company

  • Home
  • About
  • Process
  • Gallery
  • FAQ
  • Contact

© 2026 Los Angeles Drywall & Framing. All rights reserved.

Privacy PolicySitemap