Los Angeles Drywall & Framing logo
About
Process
Gallery
Services
Not sure what you need?Describe it and we'll point you right
Drywall InstallationBoard hung fast and hung straightDrywall RepairHoles, cracks and water damage undoneDrywall FinishingTaped and sanded up to Level 5Drywall TexturingKnockdown, orange peel and skip trowelDrywall PatchingSmall holes gone without a traceFire Rated Drywall InstallationType X and Type C to the listingSoundproof Drywall InstallationAssemblies built to a target STCMold Resistant Drywall InstallationBoard that survives wet roomsImpact Resistant Drywall InstallationCorridors that shrug off cartsDrywall DemolitionClean removal with the dust contained
All drywall services

Licensed, Bonded & Insured — CA Lic. #1141917

View all 45 services
Service Areas
Don't see your area?We probably cover it. Ask us.
Beverly HillsEstate finishes and hillside permitsWest HollywoodDense rentals and design district TIHollywoodStages, studios and historic coresDowntown LAHigh rise shafts and office TISanta MonicaCoastal permits and soft story retrofitsPacific PalisadesFire rebuilds under the 2026 codeMalibuCoastal Commission and salt airBrentwoodCanyon lots and Level 5 finishesCulver CityCreative office and studio buildouts
All Los Angeles areas

Licensed, Bonded & Insured — CA Lic. #1141917

View all 25 areas
FAQ
Contact
(310) 730-9832Get Free Estimate
Commercial metal stud framing at a Los Angeles shell and core project
Shell, Core & TI Steel

Commercial Metal Stud Framing in Los Angeles, CA

Commercial metal stud framing is the cold formed steel skeleton behind a commercial building's interior and exterior wall lines: partitions, shaft enclosures, rated corridors, soffits, and the backup walls that carry sheathing and cladding. Los Angeles Drywall & Framing frames full building scopes for general contractors and developers working on office cores Downtown, medical and laboratory space on the Westside, industrial and retail shells in the South Bay, and creative office conversions across the San Fernando Valley. We work outward from the concrete or structural steel frame, hold layout to the architect's control grid, and build against the superintendent's published schedule rather than one of our own.

Request a Framing Bid
Cold formed steel shaft wall and corridor framing in a Los Angeles commercial building

Shell, Core and Backup Framing

Los Angeles, CA

Full Building Scope

Steel Framing for Commercial Shells, Cores, and Tenant Improvements

A commercial building rarely gets framed once. The shell and core package puts in the elevator and stair enclosures, the mechanical shafts, the restroom cores, the demising lines between future suites, and the exterior backup walls that receive sheathing and cladding. Then the building fills, and each tenant improvement cycle rebuilds the interior around a lease plan that did not exist when the shell was permitted. We bid and staff both halves of that life cycle, which means the crew that framed the corridor knows where the backing sits when a tenant hangs casework against it years later. That continuity is usually worth more to an owner than a marginally lower unit price.

Everything we install is governed by the California Building Code as amended and enforced by LADBS. Nonstructural interior framing follows AISI S220 and ASTM C645, while anything carrying axial or transverse load follows AISI S240 and ASTM C955, which sets a minimum base steel thickness of 33 mil and a minimum G60 galvanized coating. Where a rated wall meets the underside of a rated floor above, the head of wall joint has to be a system tested to ANSI/UL 2079 and ASTM E1966, sized for the deflection and seismic drift the structural engineer publishes. Los Angeles sits in a high seismic design category, so the drift number is never decorative.

Commercial framing is a coordination trade before it is an installation trade. Sleeves, duct mains, sprinkler branch lines, conduit racks, and structured cabling all pass through the walls we build, and the sequence in which those trades arrive decides whether we frame once or frame twice. We attend the coordination meetings, mark our backing on the shop drawings, and release walls in the order the mechanical contractor actually needs them. On occupied buildings we phase by floor and by suite so that egress stays clear and the tenants below never learn our crew's names. That phasing is priced into the bid at the outset rather than discovered on site halfway through the job.

What We Frame

The Commercial Steel Scope, From Podium Slab to Roof Deck

Shell and Core Partitions

Core walls set the geometry every later trade inherits. We frame elevator lobbies, stair enclosures, restroom cores, electrical and telecom rooms, and the demising lines that define leasable area, all laid out from the structural grid rather than from the previous wall. Suite boundaries get framed to the base building standard so that a future tenant improvement can tie into them without a variance. Where the shell is delivered dark, we leave the corridor side sheathed and the tenant side open, then dimension and log the result for whoever builds next.

Shaft Walls and Rated Corridors

Cavity shaft wall lets us build a two hour enclosure from one side, which is the only practical answer for an elevator hoistway or a trash chase with no back side access. The assembly friction fits a one inch gypsum liner panel into the H section of a C-H stud, with the H section facing the shaft, and it appears in listings such as UL Design U438. Rated corridors follow the same discipline: the listed stud size, the listed spacing, the listed fastener pattern, and no substitutions decided in the field.

Exterior Backup Framing

Curtain wall, metal panel, brick veneer, and cement plaster all need a steel backup wall stiff enough that the cladding never sees the deflection. Those walls are engineered members, not partitions, so we build them to the gauge, spacing, and bridging on the deferred submittal and to the deflection limit the cladding manufacturer requires. Exterior gypsum sheathing per ASTM C1177 goes on with the fastener spacing the panel manufacturer publishes, and we hold openings to the window schedule so the glazier is not shimming out an inch of accumulated framing error.

Completed steel stud partitions ready for board in a Los Angeles office core
Cold formed steel shaft wall and corridor framing in a Los Angeles commercial building

Engineered, Not Improvised

Structural cold formed steel on our projects is designed and installed to AISI S240, and the members are specified in mil thickness rather than gauge, because that is what the standard actually governs. Thirty three mil is twenty gauge, forty three is eighteen, fifty four is sixteen, sixty eight is fourteen, and ninety seven is twelve. When a submittal calls a stud by gauge alone we go back to the engineer and get the mil.

Movement Joints That Work

A rated partition screwed tight to the deck above will crack the first time the floor loads or the ground moves. We install slotted deflection track, double track, or a listed head of wall system sized to the published deflection, and we keep the wall board short of the deck by the dimension the listing requires. Perimeter joints where the floor slab meets the curtain wall follow tested systems evaluated to ASTM E2307.

Commercial metal stud framing at a Los Angeles shell and core project
Specifications

Commercial Steel Framing Specifications

These are the values we confirm on the submittal before a stud is cut. The structural drawings always govern, but this is the vocabulary a commercial framing bid is written in.

Nonstructural studs
Interior partitions use members meeting ASTM C645 and designed to AISI S220, which permits a lower reliability factor than structural framing because the consequence of failure is lower.
Structural studs
Axially and transversely loaded members meet ASTM C955 with a 33 mil minimum base metal thickness and G60 coating, designed under AISI S240 for gravity, wind, and seismic loading.
Cavity shaft wall
Two hour hoistway and chase enclosures use C-H studs at 24 inches on center with one inch gypsum liner panel set into the H section, built from the occupied side only.
Head of wall
Rated wall to rated deck joints use systems tested to ANSI/UL 2079 and ASTM E1966, which subject the joint to its full intended movement range before the fire endurance test.
Exterior sheathing
Glass mat gypsum sheathing to ASTM C1177 over the backup wall, fastened at the published spacing and kept inside the manufacturer's stated weather exposure window before cladding.
Backing and blocking
Flat strap and stud backing for millwork, grab bars, monitors, extinguisher cabinets, and door hardware, located from the equipment schedule rather than guessed at during closeout.
Our Process

How a Commercial Framing Package Runs

We work the way general contractors in Los Angeles expect a framing sub to work: submittals first, coordination second, production third.

1

Takeoff and Submittal

We take off the partition schedule, the rated assembly types, and the exterior backup elevations, then assemble product data, the deferred submittal for engineered walls, and the listed assembly numbers for every rated condition. Long lead items such as heavy gauge structural studs and proprietary head of wall systems are ordered against the shell milestone dates, not the framing start.

2

Coordination and Layout

Wall lines are laid out from the structural control grid with a robotic total station where the project supports it, snapped on the slab, and shot up to the deck so the top track lands over the bottom track. We overlay the mechanical and plumbing coordination model to catch chases that are too narrow while they are still lines on a screen rather than steel standing on the slab.

3

Track, Studs, and Bridging

Bottom track is fastened to the slab with power actuated fasteners and top track to deck or steel, using the anchor spacing on the approved detail. Studs go in plumb at the scheduled spacing, bridging and bracing land at the required intervals, and openings get the built up jamb and header sections the structural drawings call out for that particular span and loading condition.

4

Rated Assemblies and Backup Walls

Shaft walls, corridor walls, and occupancy separations are built strictly to the listed design, including stud size, spacing, and the clearances the rated board layers need. Exterior backup framing is set to the cladding tolerance, sheathed, and released to the waterproofing and cladding subs with every opening dimensioned and verified against the door and window schedules before anyone orders glass.

5

Backing, Inspection, and Turnover

Before anything closes, we walk the floor with the superintendent against the backing list and the rated wall log, correct what we find, and call the LADBS framing inspection with the listings on site. After sign off we hand over a marked set showing rated wall locations and backing heights, which is what the next buildout crew will actually use.

Work That Goes With This

Services That Pair With Commercial Metal Stud Framing

Commercial steel framing rarely arrives alone. These are the scopes general contractors most often bundle with it.

Cold Formed Steel Framing services by Los Angeles Drywall & Framing

Cold Formed Steel Framing

Cold formed steel framing engineered to AISI S100 and S220. Stud and track systems, bridging, and load-bearing assemblies from 33 mil through 97 mil.

View Service
Steel Stud Partition Installation services by Los Angeles Drywall & Framing

Steel Stud Partition Installation

Interior steel stud partitions for offices, retail, healthcare, and hospitality. Non-load-bearing walls laid out, braced, and backed for every fixture and finish.

View Service
DensGlass Sheathing Installation services by Los Angeles Drywall & Framing

DensGlass Sheathing Installation

DensGlass and fiberglass mat gypsum sheathing installed as exterior wall, soffit, and behind-stucco substrate with correct fastening, joint treatment, and exposure control.

View Service
Fire Rated Drywall Installation services by Los Angeles Drywall & Framing

Fire Rated Drywall Installation

Type X and Type C fire rated drywall installed to the exact UL listed assembly. One, two, and three hour rated walls, shafts, and ceilings for LA commercial and multi-family projects.

View Service
Service Area

Where We Provide Commercial Metal Stud Framing

We frame commercial shells and tenant improvements across Los Angeles County, from Downtown and the Miracle Mile to the South Bay, the Westside, and the San Fernando Valley.

Central Los Angeles

  • Beverly Hills
  • West Hollywood
  • Hollywood
  • Downtown LA

Westside & Beach Cities

  • Santa Monica
  • Pacific Palisades
  • Malibu
  • Brentwood
  • Culver City

San Fernando Valley

  • Burbank
  • Glendale
  • Sherman Oaks
  • Studio City
  • North Hollywood
  • Encino
  • Van Nuys

Foothill Communities

  • Pasadena
  • Altadena

South Bay & Long Beach

  • Manhattan Beach
  • Torrance
  • Long Beach

Orange County

  • Irvine
  • Newport Beach
  • Costa Mesa
  • Huntington Beach
Common Questions

Commercial Metal Stud Framing Questions

What is the difference between shell and core framing and a tenant improvement?
Shell and core framing is base building work paid for by the developer: elevator and stair enclosures, mechanical shafts, restroom cores, exit corridors, and the exterior backup walls behind the cladding. A tenant improvement is the interior buildout inside that shell, usually paid from a tenant allowance and permitted separately. The two scopes use the same materials but run on different schedules, and the shell almost always carries stricter engineering because those walls are permanent. We bid them separately even when the same client owns both.
Can you frame in an occupied office building?
Yes, and most of our tenant improvement work in Los Angeles happens with other floors fully occupied. We phase by suite, build temporary barricades at the corridor line, keep rated egress paths open and signed, and schedule powder actuated fastening and cutting outside the building's quiet hours. Material comes up on the freight elevator during the windows building management assigns. We walk the route with the property manager first and agree in writing on hours, elevator access, dust control, and debris staging.
How do you build a two hour elevator shaft when there is no access to the back side?
That is exactly the problem cavity shaft wall solves. The system uses a C-H stud with an open H shaped web, and a one inch gypsum liner panel is friction fit into the H from the corridor side. The finish layers then go on the corridor face only, so the entire assembly is installed without anyone ever standing inside the hoistway. Listings such as UL Design U438 cover the two hour configuration with C-H studs at 24 inches on center and the H section turned toward the shaft.
What does commercial metal stud framing cost in Los Angeles?
Framing is bid by the square foot of wall surface or by linear foot, and the number moves with stud gauge, wall height, spacing, and rating. A straight eight foot office partition in twenty five gauge sits at the bottom of the range. A two hour shaft wall, a twenty foot atrium wall in heavy gauge, or exterior backup framing with sheathing is a multiple of it. Because those variables swing so far, we price from the partition schedule and elevations rather than quoting a rate over the phone.
Do you handle deferred submittals for engineered steel framing?
Yes. Exterior backup walls, tall interior walls beyond the standard stud tables, and any load bearing cold formed steel usually reach us as a design delegated scope with performance criteria on the drawings rather than finished details. We assemble the submittal with a California licensed engineer, carry it through plan check, and give the general contractor the review schedule up front so the deferred approval is not what holds up the framing start. Stamped calculations and shop drawings stay on site for the inspector.
How far in advance do you need to be scheduled?
For a standard tenant improvement we can usually mobilize inside two to three weeks, since the material is stock and the layout is straightforward. Shell and core packages need longer, because heavy gauge structural studs, proprietary shaft wall components, and engineered head of wall systems are order items rather than shelf items, and the deferred submittal review adds its own calendar. The practical answer is to bring us in at the drawing stage, where we can flag a detail that will not build.
Get In Touch

Request a Free
Estimate

We are ready to bring your project to life. Reach out for a free estimate on your drywall, framing, or specialty project. Our team responds within 24 hours.

Office LocationLos Angeles, CA
Business HoursMon-Fri: 8AM to 6PM, Sun: Open
Call Us(310) 730-9832
Email Ussales@losangelesdrywallandframing.com

Request Your Free Estimate

Los Angeles Drywall & Framing logo

Licensed drywall contractor and framing specialist serving Los Angeles, CA and the surrounding metro area. Quality craftsmanship for residential and commercial projects. CA License #1141917.

(310) 730-9832sales@losangelesdrywallandframing.com
Los Angeles, CA

Services

Drywall Services
  • Drywall Installation
  • Drywall Repair
  • Drywall Finishing
  • Drywall Texturing
  • Drywall Patching
  • Fire Rated Drywall Installation
  • Soundproof Drywall Installation
  • Mold Resistant Drywall Installation
  • Impact Resistant Drywall Installation
  • Drywall Demolition
Framing & Metal Stud
  • Wall Framing
  • Residential Framing
  • Commercial Framing
  • Rough Carpentry
  • Custom Framing
  • Rough Opening & Header Framing
  • Chase Wall & Bulkhead Framing
  • Fire Rebuild Construction
  • Metal Framing
  • Cold Formed Steel Framing
  • Deflection Track Installation
  • Steel Stud Partition Installation
  • Tall Wall Metal Framing
  • Metal Framed Ceiling Installation
  • Hat Channel Installation
  • Resilient Channel Installation
Stucco, Paint & Sheathing
  • DensGlass Sheathing Installation
  • Exterior Gypsum Sheathing
  • Stucco
  • Stucco Patching
  • Stucco Lath Installation
  • Stucco Waterproofing
  • Stucco Removal & Remediation
  • Exterior Painting
  • House Painting
  • Interior Painting
Commercial & Multi-Family
  • Commercial Metal Stud Framing
  • Commercial Wood Framing
  • Commercial Stucco
  • Commercial Painting
  • Multi-Family Drywall
  • Multi-Family Metal Stud Framing
  • Multi-Family Wood Framing
  • Multi-Family Stucco
  • Multi-Family Painting

Service Areas

Central LA & Westside
  • Beverly Hills
  • West Hollywood
  • Hollywood
  • Downtown LA
  • Santa Monica
  • Pacific Palisades
  • Malibu
  • Brentwood
  • Culver City
San Fernando Valley
  • Burbank
  • Glendale
  • Sherman Oaks
  • Studio City
  • North Hollywood
  • Encino
  • Van Nuys
South Bay & Foothills
  • Pasadena
  • Altadena
  • Manhattan Beach
  • Torrance
  • Long Beach
Orange County
  • Irvine
  • Newport Beach
  • Costa Mesa
  • Huntington Beach

Company

  • Home
  • About
  • Process
  • Gallery
  • FAQ
  • Contact

© 2026 Los Angeles Drywall & Framing. All rights reserved.

Privacy PolicySitemap