Los Angeles Drywall & Framing logo
About
Process
Gallery
Services
Not sure what you need?Describe it and we'll point you right
Drywall InstallationBoard hung fast and hung straightDrywall RepairHoles, cracks and water damage undoneDrywall FinishingTaped and sanded up to Level 5Drywall TexturingKnockdown, orange peel and skip trowelDrywall PatchingSmall holes gone without a traceFire Rated Drywall InstallationType X and Type C to the listingSoundproof Drywall InstallationAssemblies built to a target STCMold Resistant Drywall InstallationBoard that survives wet roomsImpact Resistant Drywall InstallationCorridors that shrug off cartsDrywall DemolitionClean removal with the dust contained
All drywall services

Licensed, Bonded & Insured — CA Lic. #1141917

View all 45 services
Service Areas
Don't see your area?We probably cover it. Ask us.
Beverly HillsEstate finishes and hillside permitsWest HollywoodDense rentals and design district TIHollywoodStages, studios and historic coresDowntown LAHigh rise shafts and office TISanta MonicaCoastal permits and soft story retrofitsPacific PalisadesFire rebuilds under the 2026 codeMalibuCoastal Commission and salt airBrentwoodCanyon lots and Level 5 finishesCulver CityCreative office and studio buildouts
All Los Angeles areas

Licensed, Bonded & Insured — CA Lic. #1141917

View all 25 areas
FAQ
Contact
(310) 730-9832Get Free Estimate
Commercial wood framing on a Type V building in Los Angeles
Type V Commercial Carpentry

Commercial Wood Framing in Los Angeles, CA

Commercial wood framing covers the light frame structural carpentry in a Type V or Type III commercial building: bearing walls, shear walls, hold down anchorage, floor and roof framing, and the transitions where combustible construction meets a noncombustible base. Los Angeles Drywall & Framing builds this work for general contractors and owner builders on neighborhood retail centers, standalone restaurants, small office and creative studio buildings, self storage, and the commercial ground floors of mixed use projects. Wood is the economical answer inside the height and area the code allows, and knowing exactly where that line sits is most of the job.

Talk Through Your Wood Package
Shear wall sheathing and hold down hardware on a Los Angeles commercial wood frame

Structural Carpentry and Shear Walls

Los Angeles, CA

Type V and Type III Work

Where Wood Still Wins on a Los Angeles Commercial Project

Wood framing is not a residential technique borrowed for commercial use. It is a distinct structural system with its own engineering standard, its own inspection regime, and its own hard limits. On a single story retail building, a restaurant with a mezzanine, or a two story office over parking, wood is faster to erect and cheaper to modify than steel, and it accepts the endless field changes that commercial tenants generate. Our carpenters build from the structural sheets rather than the architectural, because on a wood job the nailing schedule and the hold down schedule are the drawings that actually matter. Everything else on the job follows from what those two schedules say.

The code decides when wood stops. Allowable height and area come out of California Building Code Tables 504.3, 504.4, and 506.2 by occupancy group and construction type, and an NFPA 13 sprinkler system buys twenty additional feet and one additional story over the tabular values. Push past what Type V-B allows and the project moves to Type V-A with rated structural members, or to Type III, where CBC Section 602.3 requires exterior walls to be noncombustible with the specific exception that fire retardant treated wood framing and sheathing may be used in exterior wall assemblies rated two hours or less. Los Angeles is also a high seismic region, so lateral design drives the framing long before gravity does.

We treat the lateral system as the critical path. Shear wall panels, their edge nailing, their sill anchorage, and the hold downs that keep the wall from overturning are the elements a LADBS inspector will measure, and they are the elements that cost the most to correct after the fact. Nail spacing gets verified panel by panel, sheathing thickness and panel grade get checked against the schedule mark, and every hold down bolt is set before concrete rather than drilled afterward. Where the building steps onto a concrete podium or a masonry base, the connection detail at that transition gets built exactly as drawn, with no field substitution of hardware for whatever the supply house had in stock.

Scope of Work

What a Commercial Wood Framing Package Includes

Bearing Walls and Framing

We frame plates, studs, posts, and beams to the structural plan, with columns and multi ply members built up in the configuration and nailing the engineer specifies rather than the shop's habit. Openings in a commercial building are wide, so headers are usually engineered lumber, and their bearing and hanger hardware is installed to the manufacturer's published fastener schedule. Point loads get carried continuously down through the framing to the foundation, with squash blocks and posts stacked so that nothing lands on a rim joist and quietly crushes it over time.

Shear Walls and Hold Downs

Shear panels are laid out from the schedule mark, not eyeballed. Panel grade, thickness, edge nail size, edge spacing, field spacing, and whether blocking is required at every panel edge all come off the drawing, and we set framing widths so an edge nail never splits a two inch member. Hold downs are placed from the anchor bolt template while the forms are still open, and the bolt, the post, and the strap all line up on the same axis. Straps across the floor system are installed before the sheathing closes them out.

Fire Retardant Treated Lumber

Type III construction and certain exterior conditions require fire retardant treated framing and sheathing rather than untreated lumber. FRT material has to be identified by an approved agency mark, cut and detailed within the treater's rules, and fastened with hardware rated for contact with the treatment chemistry. We stage FRT separately on site so it is never confused with standard lumber, and we keep the labeled bundle tags available for the inspector, since a single unmarked piece found in a rated exterior wall is enough to fail the inspection and stop the job.

Completed wood framed commercial shell ready for inspection in Los Angeles
Shear wall sheathing and hold down hardware on a Los Angeles commercial wood frame

Built to the Structural Set

Commercial wood framing lives or dies on the general structural notes, the shear wall schedule, and the hold down schedule. We build to those documents, log every RFI response against the sheet it changes, and keep the current revision on site. When a field condition will not accept the drawn detail, we stop and ask rather than substituting hardware, because substituting a hold down or a hanger is an engineering decision, not a purchasing one.

Seismic Detailing for LA

Southern California framing carries load paths that most of the country never details. Drag struts, collectors, floor diaphragm nailing, and the connections that tie a wall line into the diaphragm all get built and left exposed for verification. Where the design calls for special inspection of the nailing or the anchorage, we sequence the work so the inspector sees the connection open instead of asking us to pull sheathing back off a finished wall.

Commercial wood framing on a Type V building in Los Angeles
Specifications

Wood Framing Specifications We Verify

The structural drawings govern. These are the items we check against them before the work is covered, because each is a common cause of a failed rough framing inspection.

Construction type
Type V-B, Type V-A, and Type III each carry a different fire resistance rating for structural members and exterior walls, and the choice controls whether standard or fire retardant treated lumber is permitted.
Height and area
Allowable stories and floor area come from CBC Tables 504.3, 504.4, and 506.2 for the occupancy group, and a full NFPA 13 sprinkler system adds one story and twenty feet to the tabular limits.
FRT exterior walls
CBC Section 602.3 permits fire retardant treated wood framing and sheathing in Type III exterior wall assemblies rated two hours or less, with the material qualified under Section 2303.2.
Shear wall nailing
Panel edge and field nail spacing, nail diameter, and penetration are taken from the shear wall schedule, and overdriven nails that break the panel face are called out and replaced before sheathing is accepted.
Hold down anchorage
Anchor bolt diameter, embedment, edge distance, and post size are set from the hold down schedule at the time of concrete placement rather than corrected later with post installed anchors.
Podium transition
Where wood framing bears on a concrete or masonry base, sill plates are pressure treated or separated from the concrete, and the shear transfer hardware is installed as drawn at the interface.
Our Process

Our Commercial Wood Framing Sequence

A wood package moves fast once it starts, which is exactly why the preparation in front of it matters so much.

1

Structural Review and Hardware Takeoff

We read the structural set before we price the lumber, listing every shear wall mark, hold down type, hanger, strap, and engineered member. Connector hardware is the item most likely to stall a wood job, so it gets ordered early and staged by mark. Any detail that conflicts with the architectural set goes out as an RFI during preconstruction rather than during erection.

2

Anchorage and Sill Setting

Before the slab or podium deck pours we set anchor bolts and hold down anchors from a template tied to the wall layout, verifying embedment and edge distance at each location. Pressure treated sills are then set true to the control lines, shimmed and grouted where the concrete is out, and bolted down with the plate washer size and the nut tightening the schedule specifies.

3

Wall Erection and Plumb

Walls are built on the deck, stood, plumbed, and braced in the order that keeps the lateral system stable as it goes up. Openings are framed to the door and storefront schedule, and posts under concentrated loads are set as continuous members. We keep the crew on one elevation at a time so inspection can follow the work rather than chase it.

4

Sheathing, Nailing, and Straps

Wood structural panels go on with the layout, blocking, and nail pattern the shear schedule calls for, and edge nailing is inspected by our lead before the next wall is sheathed. Floor and roof diaphragm nailing follows the same discipline. Drag straps, collectors, and continuous tie hardware are installed and deliberately left visible for the structural observation walk rather than buried under the following day's work.

5

Blocking, Backing, and Rough Inspection

Fire blocking, draft stopping, and backing for storefront systems, mechanical equipment, signage, and casework all go in as the walls close rather than as a return trip later. We then walk the building against the structural notes with the general contractor, correct anything flagged, and call the LADBS rough framing inspection with the approved plans, the hardware submittals, and the treated lumber tags on site.

Work That Goes With This

Services That Pair With Commercial Wood Framing

Wood framing on a commercial job usually shares the schedule with these scopes. We self perform most of them.

Commercial Framing services by Los Angeles Drywall & Framing

Commercial Framing

Commercial framing for offices, retail spaces, restaurants, and tenant improvements. Experienced with large-scale projects and tight commercial timelines.

View Service
Commercial Metal Stud Framing services by Los Angeles Drywall & Framing

Commercial Metal Stud Framing

Full-building metal stud framing for commercial shells and tenant improvements: partitions, shaft walls, rated corridors, and exterior backup framing on schedule.

View Service
Multi-Family Wood Framing services by Los Angeles Drywall & Framing

Multi-Family Wood Framing

Type V wood framing over Type I podium decks for apartments and townhomes, including shear walls, hold-downs, and rated floor-ceiling assemblies.

View Service
Rough Carpentry services by Los Angeles Drywall & Framing

Rough Carpentry

Structural rough carpentry including blocking, backing, furring, and all support structures required before drywall and finish work begins.

View Service
Service Area

Where We Provide Commercial Wood Framing

We build commercial wood framing throughout Los Angeles County, including neighborhood retail and restaurant work across the Valley, the Eastside, and the coastal cities.

Central Los Angeles

  • Beverly Hills
  • West Hollywood
  • Hollywood
  • Downtown LA

Westside & Beach Cities

  • Santa Monica
  • Pacific Palisades
  • Malibu
  • Brentwood
  • Culver City

San Fernando Valley

  • Burbank
  • Glendale
  • Sherman Oaks
  • Studio City
  • North Hollywood
  • Encino
  • Van Nuys

Foothill Communities

  • Pasadena
  • Altadena

South Bay & Long Beach

  • Manhattan Beach
  • Torrance
  • Long Beach

Orange County

  • Irvine
  • Newport Beach
  • Costa Mesa
  • Huntington Beach
Common Questions

Commercial Wood Framing Questions

When does a commercial project have to switch from wood to steel?
The switch is driven by allowable height and area, not by preference. California Building Code Tables 504.3, 504.4, and 506.2 set the limits for each occupancy group by construction type, and a full NFPA 13 sprinkler system adds one story and twenty feet. When a design exceeds what Type V-B allows, the options are Type V-A with rated structural members, Type III where exterior walls become noncombustible or fire retardant treated, or a different structural system entirely. We are often asked to price both a wood and a steel version before the design locks in.
What is fire retardant treated wood and when is it required?
Fire retardant treated wood is lumber or panel product impregnated with chemicals that reduce flame spread, qualified under CBC Section 2303.2 and identified with an approved agency mark on every piece. Section 602.3 permits it in the exterior walls of Type III construction where the assembly is rated two hours or less, which is the reason a mid rise building can have combustible exterior framing at all. It is not interchangeable with pressure treated lumber, it carries its own fastener compatibility rules, and cutting it is limited by the treater's instructions.
Can you frame wood over an existing concrete podium?
Yes, and that transition is one of the details we look at first. Wood bearing on concrete requires either naturally durable or pressure treated sill plates or an approved separation, and the shear transfer between the wood diaphragm and the concrete below has to be built exactly as the engineer drew it. On a podium the anchorage frequently uses cast in hardware set during the deck pour, so our involvement starts before the concrete does. Where a podium already exists and the hardware was missed, the retrofit becomes an engineered repair.
How long does commercial wood framing take?
A single story retail shell of a few thousand square feet is typically a matter of weeks once the slab is ready and the hardware is on site. A two story mixed use building with a complex lateral system runs considerably longer, because shear walls and hold downs cannot be rushed and structural observation has to keep pace. What most often extends a wood schedule in Los Angeles is not the carpentry, it is connector hardware lead time and the inspection calendar, so we build both into the schedule we hand the general contractor.
Do you handle restaurant and retail buildouts inside a wood framed shell?
We do. Restaurant work brings framing conditions that a shell package never anticipates: heavy equipment backing, hood enclosure framing, walk in cooler curbs, raised platforms, and wall assemblies that have to accept a washable finish. In a wood framed building all of that has to be added without cutting a shear panel or a bearing member, which happens far more often than owners realize. We identify the structural elements before demolition, route new work around them, and bring the engineer in when an opening genuinely has to move.
Who inspects the framing and what do they look at?
LADBS inspects rough framing before anything is covered, and on projects with special inspection requirements a deputy inspector or the structural engineer of record also performs structural observation. The items that draw the most attention are shear panel nailing, hold down installation and bolt embedment, hardware that matches the schedule, fire blocking, and notching or boring of structural members. We stage the work so those items are visible and complete at the same time, because a partial inspection that has to be repeated costs more schedule than the framing itself.
Get In Touch

Request a Free
Estimate

We are ready to bring your project to life. Reach out for a free estimate on your drywall, framing, or specialty project. Our team responds within 24 hours.

Office LocationLos Angeles, CA
Business HoursMon-Fri: 8AM to 6PM, Sun: Open
Call Us(310) 730-9832
Email Ussales@losangelesdrywallandframing.com

Request Your Free Estimate

Los Angeles Drywall & Framing logo

Licensed drywall contractor and framing specialist serving Los Angeles, CA and the surrounding metro area. Quality craftsmanship for residential and commercial projects. CA License #1141917.

(310) 730-9832sales@losangelesdrywallandframing.com
Los Angeles, CA

Services

Drywall Services
  • Drywall Installation
  • Drywall Repair
  • Drywall Finishing
  • Drywall Texturing
  • Drywall Patching
  • Fire Rated Drywall Installation
  • Soundproof Drywall Installation
  • Mold Resistant Drywall Installation
  • Impact Resistant Drywall Installation
  • Drywall Demolition
Framing & Metal Stud
  • Wall Framing
  • Residential Framing
  • Commercial Framing
  • Rough Carpentry
  • Custom Framing
  • Rough Opening & Header Framing
  • Chase Wall & Bulkhead Framing
  • Fire Rebuild Construction
  • Metal Framing
  • Cold Formed Steel Framing
  • Deflection Track Installation
  • Steel Stud Partition Installation
  • Tall Wall Metal Framing
  • Metal Framed Ceiling Installation
  • Hat Channel Installation
  • Resilient Channel Installation
Stucco, Paint & Sheathing
  • DensGlass Sheathing Installation
  • Exterior Gypsum Sheathing
  • Stucco
  • Stucco Patching
  • Stucco Lath Installation
  • Stucco Waterproofing
  • Stucco Removal & Remediation
  • Exterior Painting
  • House Painting
  • Interior Painting
Commercial & Multi-Family
  • Commercial Metal Stud Framing
  • Commercial Wood Framing
  • Commercial Stucco
  • Commercial Painting
  • Multi-Family Drywall
  • Multi-Family Metal Stud Framing
  • Multi-Family Wood Framing
  • Multi-Family Stucco
  • Multi-Family Painting

Service Areas

Central LA & Westside
  • Beverly Hills
  • West Hollywood
  • Hollywood
  • Downtown LA
  • Santa Monica
  • Pacific Palisades
  • Malibu
  • Brentwood
  • Culver City
San Fernando Valley
  • Burbank
  • Glendale
  • Sherman Oaks
  • Studio City
  • North Hollywood
  • Encino
  • Van Nuys
South Bay & Foothills
  • Pasadena
  • Altadena
  • Manhattan Beach
  • Torrance
  • Long Beach
Orange County
  • Irvine
  • Newport Beach
  • Costa Mesa
  • Huntington Beach

Company

  • Home
  • About
  • Process
  • Gallery
  • FAQ
  • Contact

© 2026 Los Angeles Drywall & Framing. All rights reserved.

Privacy PolicySitemap