Los Angeles Drywall & Framing logo
About
Process
Gallery
Services
Not sure what you need?Describe it and we'll point you right
Drywall InstallationBoard hung fast and hung straightDrywall RepairHoles, cracks and water damage undoneDrywall FinishingTaped and sanded up to Level 5Drywall TexturingKnockdown, orange peel and skip trowelDrywall PatchingSmall holes gone without a traceFire Rated Drywall InstallationType X and Type C to the listingSoundproof Drywall InstallationAssemblies built to a target STCMold Resistant Drywall InstallationBoard that survives wet roomsImpact Resistant Drywall InstallationCorridors that shrug off cartsDrywall DemolitionClean removal with the dust contained
All drywall services

Licensed, Bonded & Insured — CA Lic. #1141917

View all 45 services
Service Areas
Don't see your area?We probably cover it. Ask us.
Beverly HillsEstate finishes and hillside permitsWest HollywoodDense rentals and design district TIHollywoodStages, studios and historic coresDowntown LAHigh rise shafts and office TISanta MonicaCoastal permits and soft story retrofitsPacific PalisadesFire rebuilds under the 2026 codeMalibuCoastal Commission and salt airBrentwoodCanyon lots and Level 5 finishesCulver CityCreative office and studio buildouts
All Los Angeles areas

Licensed, Bonded & Insured — CA Lic. #1141917

View all 25 areas
FAQ
Contact
(310) 730-9832Get Free Estimate
Multi-family wood framing above a concrete podium in Los Angeles
Podium Residential Carpentry

Multi-Family Wood Framing in Los Angeles, CA

Multi-family wood framing is the light frame residential construction that sits above a concrete podium on most new apartment buildings in Los Angeles. It is the shape of the city's current housing stock: parking and retail in concrete at the street, then four or five levels of wood built around a repeating unit plan. Los Angeles Drywall & Framing frames these buildings for developers and general contractors from the transfer slab up, including bearing and shear walls, floor and roof systems, the rated separations between homes, and the vertical tie down hardware that runs the full height of the structure above the deck.

Price Your Podium Frame
Shear wall and continuous rod tie down hardware in a Los Angeles podium apartment building

Podium Framing and Tie Down Systems

Los Angeles, CA

Five Over One and Five Over Two

The Podium Building Los Angeles Actually Builds

The shorthand describes the code path exactly. California Building Code Section 510.2 allows the levels above a horizontal assembly to be treated as a separate and distinct building for the purpose of construction type, height, and area, provided that assembly has a fire resistance rating of at least three hours and the building below is Type IA. That single provision is why a wood residential structure can sit over a concrete garage and a ground floor of shops. Shafts, stairways, and ramps passing through the horizontal assembly need at least a two hour rating of their own, which is why the stair and elevator enclosures are the first thing our layout resolves at the podium line.

Above that line the building is combustible construction, and which type it is decides how we frame the exterior. In Type III-A the exterior walls have to be noncombustible, with the exception in CBC Section 602.3 that fire retardant treated framing and sheathing are permitted in exterior wall assemblies rated two hours or less. In Type V-A the framing is standard lumber with rated assemblies throughout. Sprinklers also shape the envelope: an NFPA 13R system still earns the additional story and twenty feet, but the building is capped at four stories and sixty feet, so most of the taller podium projects going up in Los Angeles carry a full NFPA 13 system instead.

The detail that makes or breaks a tall wood building is vertical movement. Solid sawn floor framing shrinks across the grain as it dries, and over five stacked levels that shrinkage adds up in the tie down rods, the plumbing risers, the elevator rails, and the cladding joints. Continuous rod tie down systems address it with shrinkage compensating devices that take up the slack as the wood dries, and they only work if they are installed at the specified elevations with the correct take up device and then re checked. We build to those details, and we schedule the rod inspections floor by floor rather than in one pass at the end.

Scope

What We Build Between the Transfer Slab and the Roof

Repeating Unit Framing

Apartment plans repeat, and framing them well means building the repetition into the process. Wall panels for the recurring unit types are laid out once, cut lists are standardized, and the crew runs the same stack on every level so the pattern becomes muscle memory. Openings are framed to the door and window schedules the first time, plumbing walls are sized for the riser package rather than a nominal dimension, and floor penetrations are located from the mechanical drawings before the sheathing goes down rather than cut out of a finished diaphragm afterward.

Rated Floor Ceiling Assemblies

The floor between two apartments carries a fire rating, an airborne sound requirement, and an impact sound requirement at the same time. California Building Code Section 1206 sets the impact insulation class at 50 for laboratory tested assemblies under ASTM E492 and E989, with a field impact insulation class of 45. That performance depends on framing decisions: joist depth, blocking, whether the ceiling is furred or directly attached, and whether any fastener bridges the resilient layer. We frame the tested assembly rather than a close approximation of it, and we keep the listing on site.

Shear Walls and Continuous Tie Downs

In a five story wood building the lateral system is dense and the overturning forces are large, so shear panels and hold downs occupy a lot of the wall length. We build each panel to its schedule mark, verify edge nailing before the wall is closed, and install continuous rod systems with the bearing plates, coupler nuts, and take up devices at the elevations the manufacturer's layout shows. Rods are left accessible for inspection at every floor line, and the take up devices are checked a second time after the frame has had a chance to dry.

Topped out wood framed residential levels over a Type I podium in Los Angeles
Shear wall and continuous rod tie down hardware in a Los Angeles podium apartment building

Podium Interface Discipline

Everything above the transfer slab inherits the accuracy of what was set into it. Rod anchorage, hold down anchors, and sill bolts are placed from the framing layout while the podium deck is still open, and we verify them against the drawings before the pour. A rod that lands an inch off its post at level two is not one problem, it is the same problem repeated on four more floors above it.

Inspection Held Open

Wood framed residential projects in Los Angeles carry rough framing inspection plus structural observation and, on most podium buildings, special inspection for the tie down system and the nailing. We stage each level so shear nailing, hardware, and rods are visible together, keep the approved plans and the hardware submittals on site at all times, and track sign offs level by level so that nothing gets buried ahead of its approval.

Multi-family wood framing above a concrete podium in Los Angeles
Specifications

Podium Wood Framing Specifications

The stamped structural drawings control every project. These are the code provisions and framing conditions that define a Los Angeles podium residential package.

Horizontal separation
CBC Section 510.2 allows the wood structure above to be considered a separate building where the horizontal assembly is rated at least three hours and the construction below is Type IA.
Shafts through the podium
Shaft, stairway, ramp, and escalator enclosures penetrating the horizontal assembly require a fire resistance rating of not less than two hours with opening protectives under Section 716.
Sprinkler limits
An NFPA 13R system provides the one story and twenty foot increases but caps the building at four stories and sixty feet, which is why taller podium projects carry a full NFPA 13 system.
Type III exterior walls
Where the residential levels are Type III, CBC Section 602.3 requires noncombustible exterior walls except that fire retardant treated framing and sheathing are permitted at ratings of two hours or less.
Impact sound
Floor ceiling assemblies between dwelling units must reach IIC 50 in the laboratory under ASTM E492 and E989 and FIIC 45 in the field, with permanent floor coverings counted as part of the assembly.
Vertical shrinkage
Solid sawn floor framing shrinks across the grain as moisture content drops, so continuous rod tie down runs include shrinkage compensating take up devices at the elevations the system layout specifies.
Our Process

How a Podium Wood Frame Goes Up

Each residential level is a repeat of the one below it. The work that makes the repeats fast happens at the podium and in the shop drawings.

1

Preconstruction and Hardware Release

We read the structural set, build the hardware schedule, and release long lead connectors and the continuous rod tie down package early, since those items set the framing start more often than lumber does. Unit type cut lists and panel layouts are developed at the same time, so the crew that arrives on the transfer slab already knows what level three looks like.

2

Transfer Slab Layout and Anchorage

Wall lines are laid out on the podium deck before the pour, and rod anchorage, hold downs, and sill bolts are set from that layout and verified against the hardware schedule. We also confirm the shaft and stair openings through the horizontal assembly at this stage, because their two hour enclosures start at this level and cannot be relocated later.

3

Level One Residential Framing

The first wood level is framed, sheathed, and plumbed with more care than any level above it, because it becomes the template. Bearing lines, rod locations, and unit dimensions are all checked against the drawings before the floor above is set. Once this level is verified and signed off, each of the remaining levels repeats it on a much shorter cycle.

4

Stacked Levels and Floor Systems

Levels stack on a repeating cycle of walls, floor framing, sheathing, and shear hardware, with rods coupled through at each floor line. Rated floor ceiling assemblies are framed to their listing, including blocking, ceiling furring, and penetration locations. Fire blocking and draft stopping go in as each level closes rather than as a return trip after the frame is topped out, which is when they become expensive.

5

Take Up Verification and Turnover

After the frame is topped out and has begun to dry, we return to the rod runs to verify take up devices and re check the tie down system, then walk the building for structural observation and the LADBS rough framing inspection. Backing for cabinets, grab bars, closet systems, and equipment is completed by unit type so the interior trades can start without a punch list of missing blocking.

Work That Goes With This

Services That Pair With Multi-Family Wood Framing

Podium residential projects move through these scopes in sequence, and carrying more than one of them under a single contractor keeps the handoffs clean.

Multi-Family Metal Stud Framing services by Los Angeles Drywall & Framing

Multi-Family Metal Stud Framing

Load-bearing and non-load-bearing steel stud framing for mid-rise apartments and mixed-use podium buildings, sequenced floor by floor to keep the trades moving.

View Service
Commercial Wood Framing services by Los Angeles Drywall & Framing

Commercial Wood Framing

Type V wood framing for commercial and mixed-use buildings across Los Angeles, including shear wall assemblies, hold-downs, and podium-level transitions.

View Service
Residential Framing services by Los Angeles Drywall & Framing

Residential Framing

Full residential framing services including walls, floors, and roof structures. From single-family homes to multi-unit projects throughout Los Angeles County.

View Service
Multi-Family Drywall services by Los Angeles Drywall & Framing

Multi-Family Drywall

Production drywall for apartments, condos, and podium projects. Rated demising walls, shaft walls, and corridor assemblies hung and finished unit by unit.

View Service
Service Area

Where We Provide Multi-Family Wood Framing

We frame podium apartment and condominium buildings across Los Angeles County, including infill projects in the Valley, the Eastside, South LA, and the coastal cities.

Central Los Angeles

  • Beverly Hills
  • West Hollywood
  • Hollywood
  • Downtown LA

Westside & Beach Cities

  • Santa Monica
  • Pacific Palisades
  • Malibu
  • Brentwood
  • Culver City

San Fernando Valley

  • Burbank
  • Glendale
  • Sherman Oaks
  • Studio City
  • North Hollywood
  • Encino
  • Van Nuys

Foothill Communities

  • Pasadena
  • Altadena

South Bay & Long Beach

  • Manhattan Beach
  • Torrance
  • Long Beach

Orange County

  • Irvine
  • Newport Beach
  • Costa Mesa
  • Huntington Beach
Common Questions

Multi-Family Wood Framing Questions

What does five over one actually mean in the building code?
It describes a wood residential structure of up to five levels sitting on a single level of concrete construction, and the code mechanism is California Building Code Section 510.2. That section allows the portions above and below a horizontal assembly to be treated as separate buildings for construction type, height, and area, provided that assembly is rated at least three hours and the building below is Type IA. Five over two is the same idea with two concrete levels. The upper structure is then evaluated on its own, which is what makes wood feasible at that height.
Why do tall wood buildings need shrinkage compensating hardware?
Because lumber loses dimension across the grain as it dries, and in a platform framed building every floor adds another band of cross grain material. Over five levels that accumulated shrinkage leaves slack in a continuous rod run, and slack means the hold down does not engage until the wall has already moved. Shrinkage compensating take up devices sit in the rod run and close that gap automatically as the frame dries. They have to be the specified device at the specified elevation, and the run should be re checked later.
What is the difference between an NFPA 13 and an NFPA 13R sprinkler system for a podium project?
Both earn the building the additional story and the additional twenty feet of height over the tabular limits, but NFPA 13R carries a hard ceiling: the building cannot exceed four stories or sixty feet. NFPA 13 is a full system with no such cap, which is why most five level podium projects in Los Angeles carry one. For our scope the difference shows up in coordination, since a full system means more piping, more penetrations through rated assemblies, and more backing for hangers and heads.
How do you keep sound from carrying between apartments in a wood building?
The framing decisions are made before the drywall crew ever arrives. Between units the wall is normally a double stud or staggered stud assembly with an unbroken cavity, and the floor above is a rated assembly whose ceiling may be furred on resilient members. California Building Code Section 1206 requires an impact insulation class of 50 for the tested floor ceiling assembly and a field impact insulation class of 45. Our part is to frame the tested configuration exactly, keep bridging out of the cavity, and avoid running blocking or plumbing continuously between units.
Can you frame the wood structure if another contractor built the podium?
Yes, and it is a common arrangement, since the concrete package is frequently a separate contract. What we ask for before mobilizing is an as built survey of the deck: elevations, anchorage locations, and embeds. If the anchorage was set from an earlier drawing revision or drifted during the pour, that has to be resolved with the engineer of record before framing starts, because a post installed correction at level one has to carry five levels of load. Identifying it in advance costs a survey. Discovering it during erection costs weeks.
How long does it take to frame a five story podium building?
The first residential level takes disproportionately long and the rest settle into a repeating cycle, so the total depends more on the floor plate and on crane and material logistics than on the story count. Delays on Los Angeles projects cluster in three places: connector and rod hardware lead times, the inspection calendar for structural observation, and weather windows on an exposed frame. We give general contractors a level by level schedule with those three items called out separately rather than buried in one framing duration.
Get In Touch

Request a Free
Estimate

We are ready to bring your project to life. Reach out for a free estimate on your drywall, framing, or specialty project. Our team responds within 24 hours.

Office LocationLos Angeles, CA
Business HoursMon-Fri: 8AM to 6PM, Sun: Open
Call Us(310) 730-9832
Email Ussales@losangelesdrywallandframing.com

Request Your Free Estimate

Los Angeles Drywall & Framing logo

Licensed drywall contractor and framing specialist serving Los Angeles, CA and the surrounding metro area. Quality craftsmanship for residential and commercial projects. CA License #1141917.

(310) 730-9832sales@losangelesdrywallandframing.com
Los Angeles, CA

Services

Drywall Services
  • Drywall Installation
  • Drywall Repair
  • Drywall Finishing
  • Drywall Texturing
  • Drywall Patching
  • Fire Rated Drywall Installation
  • Soundproof Drywall Installation
  • Mold Resistant Drywall Installation
  • Impact Resistant Drywall Installation
  • Drywall Demolition
Framing & Metal Stud
  • Wall Framing
  • Residential Framing
  • Commercial Framing
  • Rough Carpentry
  • Custom Framing
  • Rough Opening & Header Framing
  • Chase Wall & Bulkhead Framing
  • Fire Rebuild Construction
  • Metal Framing
  • Cold Formed Steel Framing
  • Deflection Track Installation
  • Steel Stud Partition Installation
  • Tall Wall Metal Framing
  • Metal Framed Ceiling Installation
  • Hat Channel Installation
  • Resilient Channel Installation
Stucco, Paint & Sheathing
  • DensGlass Sheathing Installation
  • Exterior Gypsum Sheathing
  • Stucco
  • Stucco Patching
  • Stucco Lath Installation
  • Stucco Waterproofing
  • Stucco Removal & Remediation
  • Exterior Painting
  • House Painting
  • Interior Painting
Commercial & Multi-Family
  • Commercial Metal Stud Framing
  • Commercial Wood Framing
  • Commercial Stucco
  • Commercial Painting
  • Multi-Family Drywall
  • Multi-Family Metal Stud Framing
  • Multi-Family Wood Framing
  • Multi-Family Stucco
  • Multi-Family Painting

Service Areas

Central LA & Westside
  • Beverly Hills
  • West Hollywood
  • Hollywood
  • Downtown LA
  • Santa Monica
  • Pacific Palisades
  • Malibu
  • Brentwood
  • Culver City
San Fernando Valley
  • Burbank
  • Glendale
  • Sherman Oaks
  • Studio City
  • North Hollywood
  • Encino
  • Van Nuys
South Bay & Foothills
  • Pasadena
  • Altadena
  • Manhattan Beach
  • Torrance
  • Long Beach
Orange County
  • Irvine
  • Newport Beach
  • Costa Mesa
  • Huntington Beach

Company

  • Home
  • About
  • Process
  • Gallery
  • FAQ
  • Contact

© 2026 Los Angeles Drywall & Framing. All rights reserved.

Privacy PolicySitemap